Smt. Roop Rani hereinafter called the Appellant has filed the present appeal dated 31.10.2012 before the commission against the respondents namely (1) Shri A.K Gupta, Director Cum PIO, Monitoring and appraisal directorate, central water commission, Bhujal Bhawan, Sector 27A, Chandigarh, (2) Shri Bhupinder Singh, Superintending Engineer cum CPIO, Indus Basin Organization, central water commission, Sector 9A, Chandigarh and (3) Shri Y.K Handa, chief Engineer cum first appellate authority, Indus Basin Organization, central water commission, Kendriya sadan, sector 9A, Chandigarh. The Appellant and Respondents both were present in the hearing conducted through Video conferencing. Page 1 of 6
2. The Appellant through the RTI application dated 04.06.2012 sought information on following 8 points as follows- (1) certified copies of earned leave/HPL/commuted leaves ta